Evidence basis
Pilot-recorded internal evidence drawn from the build artefacts described in the Construction Take-off Suite dossier. It is not an independent third-party certification.
- 210 bill lines were produced across 20 trade sheets.
- Of the 52 comparable lines, 50 carried MEASURED status and 2 were declared PARTIAL SCOPE.
- All 52 comparable lines were within ±10% of the client benchmark.
Read with scope
These constraints travel with the metrics. They are part of the result, not fine print.
- The accuracy figures cover 52 reconciled, comparable lines—not the full project bill.
- Reconciliation balances, figures adopted from the client take-off, and scope gaps were excluded from the accuracy calculation.
- The stated measurement convention was assumed pending client confirmation; this page does not claim confirmed POMI compliance.